Project 1

Facade Gizmo Optimal Proposal

In group of 4 are to select a facade of their choice from an existing building. Assuming that we are given the task by the building owner to renovate the building. Identify the problems associated with visual, thermal and site environmental matter. Propose ‘gizmos’ or devises that are able to improve the indoor environment to the building owner with the following considerations:


a) Specify the correct choice of building materials and components with basic understanding of their physical properties, characteristics and environmental impact.
b) Analyze the series of configured options.
c) Identify the optimal options.

PG1 - SITE INTRODUCTION, SUN & WIND ANAL
PG2 - METHODOLOGY, BASELINE MODEL & GIZM
PG3 -SIMULATION 1 & 2.jpg
PG4 - SIMULATION 3 & OPTIMIZED GIZMO.jpg

Project 2

Services Core Optimal Proposal

Using the design studio project, identify the problems associated with visual, thermal and site environmental matter. These factors are to be analyzed using the appropriate formula. Propose service core/s that will improve the indoor environment and comply to the necessary regulations with the following considerations:
a) Specify the correct choice of orientation and components with basic understanding of their requirement, characteristics and environmental impact.
b) Analyze the series of configured options
c) Identify the optimal options.
d) Incorporate the necessary statutory requirements
Produce a handbook providing the studies and proposals of the above components. 

Project 3

Synthesis - Integrated Design

Produce 2 A1 presentation boards, which contains the overall analysis and outcome learnt from Assignment 1 and Assignment 2, to be applied in the studio project that demonstrates similar approaches towards the environmental and technological resolution.

ENT2_FINAL PROJECT_YANG JING LOO_0323066